Tuesday, May 11, 2010
IT'S MY TURN NOW!!!
TNBR MONTHLY INTELLECTUAL DISCOURSE

FIRST SITE VISIT @ PULAU BANDING
* i forgot to publish this entry...this should be before the Pulau Banding 1...sorry for the inconvenience....
*Thermography Analysis*
according to contractor, base on their inspection..they found hot spot at overhead line...how they capture the hot spot??? picture above, somthing like camera hold by En. Faris was used to determine the hot spot location... however, hot spot cannot be seen (not really clear) on bright day...
this is the location of hot spot...they did the analysis at night...the joint was on a tray at the pole
this is the scanned picture...above this was the original firgure and this is the result they get and evaluate the level of hot sopt base on the temperature...different location will have different temperatute...as u can see in the picture...the 20 degree C was the references temperature at that surrounding..if there is a spot with temperature high than its references temperature, they will clarify it as hot spot...short discussion with the boss about what we should do when we come back later....
Sunday, May 9, 2010
Pulau Banding II
This is my 3rd time at Pulau Banding....this time, the purpose still the same..install the same equipment...measure the same thing...expect to have the pattern of current as theory...the only different from previous, this time we install at termination...
why we dont install at termination before???
oraite...like this...we all experienced the blackout nite...sleep without fan/air-con...for sure u will mad because no electricity all of sudden...so that, in order to avoid customer unsatisfied..we should give them a notice in order to do the shutdown.....
at termination..we need to shutdown fisrt before we can touch the joint...if there is still voltage up there n u touch it...in few second u will 'goal'....so that shutdown is the solution to avoid any death....
how to check whether the voltage/current zero or not???
CBM course
CBM Course @ TNB Intergrated Learning Solution Sdn. Bhd. (ILSAS)
week 4 : Pulau banding I
last sunday, we had a site visit... actually the actual date for us to do the installation is on week 5 but since there is certain reason we need to bring forward the date...
DAY 1 : 26/4/10 (travelling day)
DAY 2 : 27/4/109.30 - breakfast
10.00 - drive to the site (pole 102, 90, 88)
10.40 - reset Current Transformer / energy logger (at site)
11.15 - install energy logger at straight trough joint (on the tray at the top of pole)
complete installation for the 1st day
those two pictures above are taken during the installation process..according to En. Saeidin, this work are done 7m from the land. the person who is responsible to do this must know the theory behind it as well, its not simply go up there and plug in the device. ie; the person should now the basic idea about eletcric. however, this activity was supervised by the TNBR's foreman from cable unit.
NEW EQUIPMENT
Setup Energy Logger by the seller
in yellow circle is Current Transformer
(on site)
EQUIPMENT 2 : DIELECTRIC SPECTROSCOPY TESTING

in yellow circle is High Voltage Unit
there are two common types of cable that have been use for UG cable which are PILC and XLPE... since the type already different, therefore the way to handle DS test also different..
what differentiate them is just ' High Voltage Unit '.... for XLPE cable, it require HVU in order for us to see the dependent voltage..as i explained before, water tree can only occur in XLPE cable...therefore the dependent voltage will help in determining the existence of water tree...
Result Comfirmation